PROJECT
A few of our respective project can be reviewed below
Oakhill Community, 175 home site wastewater treatment system upgrade, Attleboro, MA
Conduct soil and groundwater study for hydrogeological and groundwater discharge permitting, 2009-present
Bearcraft Subdivision Development, Attleboro, MA
Wetland delineation and permitting, soil evaluation for septic system design, wildlife (marled salamander, four-toed salamander, spotted turtle) filed survey and habitat mapping for a 12-lot subdivision, 2005-2008.
Sawyer Hill Co-housing, Berlin, MA
Hydrogeological study, 21600 gpd common wastewater treatment design and permitting for 68 unit co-housing development, 2005-2008.
Consultant to Town of Weymouth, MA
Reviewing the design and permitting to assure the Town’s drinking water source and wetland resources not to be impacted by Weathervane Golf Course and over 200 units Condominium Development, 1996-2009.
Sylvan Spring Subdivision-64 luxury home development, Mendon, MA
In charge of the wetland delineate of about 130 acres of land, stormwater management design, and permitting with several commissions, overcoming hurdles of wetland crossing and bridge design, wetland replication, Indian historic site protection, ENF, 401 WQC and 404 permitting and construction sediment and erosion control monitoring and inspection
Pingry Hill Residential Subdivision, Ayer, MA: Environmental Compliance and Monitoring
This is a five-phase 155 lot subdivision. CLAWE provided successful solutions to control sediment and erosion problems and brought runoff turbidity from 600 NTUs to less than 50 NTUs, which lead to a quick settlement of enforcement order and related issues with Ayer Conservation Commission and MA DEP.